Both locks will be closed to boat traffic August 23 from 9:30 a.m. to 1:00 p.m. for regular inspection of the salmon exclusion structure.
Also posted by @ChittendenLocks and MyBallard.
Preserving the History of the Hiram M. Chittenden Locks in Seattle, Washington
Contact us at friendsofthelocks@gmail.com
Contact us at friendsofthelocks@gmail.com
Showing posts with label closures. Show all posts
Showing posts with label closures. Show all posts
Monday, August 22, 2011
Sunday, June 5, 2011
Info: Locks Closure Tuesday June 7th 2011
Labels:
closures,
engineering,
locks,
maintenance
Both locks will be closed from 7:30 AM to 1:00 PM on Tuesday, June 7th for inspection of ASES (the Adult Salmon Exclusion Structure).
Reprinted with permission for information purposes:
Reprinted with permission for information purposes:
Hiram M. Chittenden Locks
5 1/2 Hour Lock Closure, June 7th 2011
On Tuesday, June 7th 2011, both the large lock and small lock will be closed from 0730-1300, for an inspection of the Adult Salmon Exclusion Structure. The structure is in place near the middle pier between the east entrances to both locks. There will be divers in the water during this time period, preventing lock operations. The only exception will be for emergency vessels (Seattle Fire Dept., Seattle Police, and Coast Guard) on an emergency call. Any questions should be referred to David Carpenter, Navigation Supervisor 206-789-2622 ext.202, or the Lockmaster on duty, 206-783- 7000
Subscribe to:
Posts (Atom)