It is time for the annual inspection, cleaning, and maintenance of the small lock!
On March 13, the water remaining in the chamber was pumped out so the lower walls and floor are accessible.
The pumps for this operation are located underneath the Administration Building. If you peek in the basement windows, you may be able to see some of the plumbing for the pumps.

It takes about 4 hours to drain the small lock whereas the large lock (pictured left) requires about 10 hours to pump dry. See previous entries on the Large Lock Pump Out and More Pump Out Pictures.
Without unforeseen findings, the small lock re-opened to boat traffic by March 23.
See the Official Hiram M. Chittenden Locks page for the most current updates and information about the locks and the ship canal.






The 


Studies had shown that smolts (juvenile salmon) were having a difficult time going through the Locks, which is their only passageway from the Lake Washington basin out to Puget Sound. Fish would get injured or killed when pulled into the filling tunnels or going over the spillway dam. In 1995 a prototype flume was installed to determine their feasibility, when deemed successful the current models were built at the Puget Sound Naval Shipyard and installed in May 2000.
The term smolt comes from the word "smoltification" which is the biological process the juvenile fish go through which enables them to make the transition from fresh to salt water.